- construction

- inspection

- repair

- rehabilitation and strengthening

- special activities

cleaning of oil contaminated soils in oil terminals and port facility areas

sampling of structure’s materials in underwater zone

corrosion protection of oil tanks and pipelines

participation in installation of heavy steel-works

underwater works

GT Corporation specialists possess experience in operations for installation and erection of heavy and large metal structures.

For this purpose, Method Statement Project is worked out, engineering works to construct the erection site are undertaken, the necessary equipment is defined. Then accessories and auxiliary structures necessary for the safety of lifting and joining of modules are designed, fabricated and placed in situ.


In 2002 in Kaliningrad region the specialists of GT Corporation participated in the uplifting and erection of the jacket panels of offshore platform as part of LUKOIL-Kaliningradmorneft Kravtsovskoe (D-6) oilfield development. Each panel weights about 270 t.