- construction

- inspection

- repair

- rehabilitation and strengthening

installation of additional anchor rods

installation of soil anchors

construction of underwater sheet-pile walls

installation of additional piles in the structure’s foundation

- special activities

For accommodating larger ships the increase of depth at the existing waterfront was impossible due to the bearing capacity requirements. Structurally, the berth represented a pile-foundation jetty on reinforced concrete tubular piles. For harbour basin dredging from the existent elevation of minus 6.5 m to the required minus 10.0 m the berth rehabilitation was needed.

The essence of the engineering solution proposed by GT Corporation consisted of:
      construction in front of the quayline of an underwater sheet pile wall;
      anchoring of underwater wall with soil anchors.
Installation of additional piles in the structure’s foundation Installation of additional piles in the structure’s foundation Installation of additional piles in the structure’s foundation
Installation of additional piles in the structure’s foundation

The implementation of proposed solution ensured:
      maximum use of the existing structural elements in the construction of the rehabilitated structure;
      minimum change of the operational regime of quay areas during work execution;
      possibility for future depth increase at the berth up to 12 m.